Travel

Major Thika Highway Closure: New 7-Day Traffic Plan

Spread the love

Nairobi, Kenya – Motorists who rely on the busy are being urged to prepare for major disruptions after the announced a partial closure at the .

Starting Thursday, March 12, 2026, commuters traveling toward the will face traffic interruptions due to reinstatement works on the .

The infrastructure works are scheduled to run for seven days and are expected to conclude on March 19, 2026. Because the Globe Roundabout is one of Nairobi’s most critical transport interchanges, authorities warn that heavy congestion is likely on surrounding routes as motorists adjust to the new traffic plan.


Why the Road Is Being Closed

The temporary shutdown is required to allow technical investigations and stabilization works on the Nairobi River bridge.

READ ALSO   Kenyan Woman Faces Execution in Vietnam Over Cocaine Trafficking

According to the , the reinstatement project is necessary to improve the long-term safety and structural stability of the bridge.

Officials added that temporary traffic controls and lane management measures may change as engineers continue their investigations and construction work.


Official Traffic Diversion Plan

To reduce congestion and maintain traffic flow during the construction period, KeNHA has issued a detailed diversion plan for motorists.

1. Motorists Heading to Nairobi CBD from Thika

Drivers traveling from Thika toward the city center will need to bypass the Globe Roundabout entirely. Instead, motorists will use the , which will serve as the main route for vehicles entering the CBD.

READ ALSO   Book Easy Coach Tickets Online in 5 Simple Steps

2. Traffic Destined for University Way

Motorists coming from Thika and heading to are advised not to access the roundabout. Instead, they should exit earlier via , which will act as the main link to that area.

3. Access to Kirinyaga Road and OTC Terminus

Drivers heading toward or the should use , helping spread traffic away from the central interchange.

4. Traffic from Kipande Road

Motorists joining from and traveling toward the CBD should use near the Fig Tree area, then connect to .

5. Alternative U-Turn Point

Drivers who previously used the Globe Roundabout to make U-turns will now need to proceed to the to change direction safely.


Safety Advisory for Motorists

With engineers and heavy equipment expected to operate around the construction site, the area surrounding the Globe Roundabout and the will be considered a high-risk zone.

READ ALSO   Ruto Overhauls Kenya’s Diplomatic Posts – Full List of New Ambassadors

The is urging drivers to remain alert, follow traffic instructions, and cooperate with police officers and traffic marshals stationed in the area.

Officials also noted that lane closures or additional diversions may be introduced depending on how the stabilization works progress.


Tips for Commuters During the Closure

Authorities are advising commuters to take several steps to minimize delays during the seven-day construction period:

  • Plan Ahead: Review the diversion routes before starting your journey.
  • Leave Early: Allow an extra 30–45 minutes of travel time.
  • Use Alternative Transport: Consider options such as the or matatus using bypass routes.
  • Stay Updated: Follow updates from the for real-time traffic information.

Infrastructure Upgrade for Safer Travel

The rehabilitation of the forms part of broader efforts to strengthen infrastructure along the , one of the busiest highways in Kenya.

Although commuters may face delays over the coming week, authorities emphasize that the project is essential to ensuring long-term safety and efficiency for the thousands of drivers who rely on the route every day.


Spread the love
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Most Popular

To Top